Super SportShane has gotten half the plywood bottom installed this week! 1935 ElectriCraftThis pretty little electric boat came down from Roaring Gap with some damage along the side. Gary got it all taken care of and Jack is taking the boat back up to Roaring Gap over the weekend. Correct Craft MustangJack installed a new blower (not pictured) and a bunch of new switches and buttons on the dash. Concordia SloopThis side of the boat has a first coat of paint and is getting sanded in preparation for a second coat today. The other side will get the first coat at the same time. Jack has also been working on some varnish for the interior pieces in our low dust varnish room! 1947 Deluxe RunaboutJack and Gary picked this engine up from Georgia last Friday! Things are coming together! U-18Jack worked hard this week to get the valves on this engine working.
0 Comments
Lyman IslanderOur sign guy, Mike Gregson of Gregson Signs, came by to do the lettering on The Lazy B this week. Caity has been working on sanding the sides in preparation for painting. Concordia SloopShane has been working on the seats and floorboards this week. He's run everything through the planer to take off a layer of dirt and paint, sanded edges, bunged and epoxied screw holes, and he's just about ready to prime all these pieces! SuperSportShane fit and installed the aft sub-bottom plywood structural pieces and the new inner planking layer on the transom. SportsmanJack and Caity milled new book-matched wood for the forward covering boards on the deck. Jack started fitting all the deck covering boards. Shane painted the floorboards in preparation for covering them with flooring material. 1947 Chris Craft Deluxe RunaboutCaity has been steadily working on these bungs! There are so many! PuntGary finished up the details on the punt and Jack delivered it to Roaring Gap this week.
We've been all over the place this week! Jack took a day trip up to Roaring Gap to deliver a boat, work on some boats at their moorings, and bring another boat back to the shop. Gary went up to Kerr Lake to do a marine survey. New Boat (a Roaring Gap boat)Jack picked New Boat up last week and brought her back to the shop, fixed the steering, and took her back to her boat house this week! Eeyore (a Roaring Gap boat)Jack brought Eeyore back with him from Roaring Gap and we're getting the prop to motor coupler machined. Lyman IslanderCaity has been working on sanding the exterior of the Islander this week and Jack put more of the interior back together. Concordia SloopShane has been working meticulously on the details of this boat. PuntWe've got some of the interior pieces out for fresh varnish. 1947 Deluxe RunaboutWe've got two coats of primer on the bottom of this boat. It's almost ready to right! SportsmanWe laid out all the deck and floorboard pieces of this boat this week to see what could be used and what is missing or needs to be replaced. Shane is working on the floorboards. SuperSportShane installed the battens on the transom this week. The word batten refers to a strip of wood used to strengthen something or hold it in place. These look like they'll do a great job! U-18Jack's got the pressure washer and the ShopVac out today doing a final bilge clean out. ContinentalJack adjusted the existing bunks on the trailer to provide a better fit and added some new ones as well. 1958 ContinentalWe don't have any pictures this week, but Gary dropped off the upholstered interior pieces at the upholsterer in Raleigh. That's an exciting step! RivieraThis boat passed its sea trial and is ready to go home. Check out that gorgeous trailer!
Gary and Jack spent a day up at Roaring Gap delivering a boat, checking out and servicing several other boats, and bringing one back to the shop. Budsin Lightning BugThe guys brought this gorgeous boat back from Roaring Gap and Jack has already fixed the steering linkage. SuperSportShane has been working on the plywood bottom of the Super Sport this week. It's a long process, but it's coming together so nicely! Concordia SloopShane has been taping off sections of the Concordia to put more paint on. 1950 RivieraJack has been working hard on the Riviera this week. He got it on the brand new custom trailer and it's just about ready to go! He's just finishing up some adjustments on the engine. PuntThe whole crew worked together to flip the punt over this week so we could wash and paint the inside. Correct Craft MustangThis boat arrived this week for us to work on. It's a little different from most of the rest of the boats in the shop and it should be fun!
|
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
October 2025
Categories |
RSS Feed