Gary has been repairing the centerboard for the Concordia Sloop. Jack helped unload a brand new Yamaha outboard engine for the Flats boat. Gary and Shane have been working on fiberglassing the floorboards for the Flats boat. This week on the '57 Continental, Jack installed the engine after making modifcations to the motor mounts and reinstalled the strut, prop shaft and propeller, and rudder. He got everything hooked up to the engine including wiring and hoses and finally installed the new dashboard and gauges, switches, and steering box. He also installed the thru-hulls for the drain plug, tank vent, and both bilge pumps. He removed the old, rotten battery box and replaced it with new wooden framing. Next, we'll install the fuel tank and start putting the interior together! Shane has milled the wood for and made the final two frame replacements and is continuing to work on replacing rotten framing on the transom on the SuperSport.
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
February 2025
Categories |