AuthorOur shop blog features regular updates about the projects currently in the shop. Archives
November 2026
Categories |
Back to Blog
Week of November 9-13, 202611/13/2026 Custom RunaboutJack got the engine mounted, aligned, and wired. SportsmanWe got the final coat of varnish on the Sportsman this week. It looks incredible! Christ Craft DeluxeCaity and Shane have been tag teaming the installation of side planks on this boat. FlatsJack has been working on the cove stripe for this boat. It's almost finished and it really showcases his creativity and artisanship! Concordia SloopJack and Shane took the sloop to the lake without rigging, launched her, and tested the lead ballast and electric trolling motor. Jack said it went really well and the fall day was perfect.
0 Comments
Read More
Back to Blog
Week of November 2-6, 202611/6/2026 ContinentalAfter doing a valve adjustment, removing the engine manifolds, and head and cleaning everything thoroughly, we reinstalled and tested the engine. Soon to be followed by several rounds of head bolt torquing. Larson RunaboutAfter lots and lots of prep, we put new fiberglass down on the keel and bottom. Deluxe RunaboutShane finished installing and shaping the transom framework and steam-bent two side planks. PelicanPhil put several coats of primer and paint on the bottom after fairing his fiberglass repairs. We also came across some bubbles in the cold-molded plywood. We used structural epoxy to repair those. Custom RunaboutAfter plenty of struggling and tinkering, Jack finally got the new motor mounts mocked up and shaped the exhaust to fit. FlatsWe custom fit brand new stainless steel rub rails and spray rails and installed new registration numbers.
Back to Blog
October 23rd, 202610/23/2026 Chris Craft SportsmanGary is working on putting the last components on the rebuilt engine in preparation for a test run. Caity brought the boat into the finish room for a final coat of varnish on the deck. Custom RunaboutJack made new, modified engine brackets and got them tested in place in the boat. Pelican electric boatPhil removed the electronics, deck hardware, and interior and washed the entire boat. After we rolled it, he started sanding and making fiberglass repairs. Flats boatJack installed the outboard engine rigging and hydraulic steering. Shane made fishing rod holders for the interior.
Back to Blog
Week of October 12-16, 202610/16/2026 Flats BoatWe finished mounting, installing, and wiring instruments on the helm and installed the tie down hardware for the forward casting platform. Custom CruiserWe removed the engine and the rotten floor framing and started peeling back the side planking in order to remove the transom. Chris Craft DeluxeShane finished making and dry fitting the new transom frames and battens. Concordia SloopShane reprimed the bottom after a paint failure.
Back to Blog
Week of October 5-9, 202610/9/2026 Chris Craft ContinentalWe got the engine head back from the machine shop and it's shiny and resurfaced. We also got a brand new head gasket. Concordia SloopWe permanently installed the new custom lead keel with 5200. 1982 Pelican Electric BoatWe just got in a new project this week. We're looking forward to giving this boat some TLC. Chris Craft Deluxe RunaboutShane has been removing and replicating rotten frames one by one. LarsonUnfortunately, we keep finding more delamination on the Larson as we sand back the fiberglass.
Back to Blog
Week of September 28 - October 2, 202610/2/2026 Chris Craft ContinentalJack removed the engine head and manifolds to access the valve and performed a valve adjustment. The engine head is off to the machine shop before it gets reinstalled. Custom CruiserJack removed the outboard lower unit so it can be worked on. Chris Craft DeluxeAfter discovering more rot in the transom, Shane has been removing exterior planks to access the transom frames. He's starting to replicate and replace the transom frames. LarsonPhil is doing some final sanding and prep before we make fiberglass repairs to the bottom. Chris Craft DeluxeJack bench tested the rebuilt engine, which was a success. Concordia SloopThe guys pre-drilled bolt holes on the custom cast lead ballast, painted them with a barrier coat of primer, and prefit them to the boat. We will be installing them next week.
Back to Blog
Week of September 21-25, 20269/25/2026 Chris Craft DeluxeThe guys have been working on repairing some side and transom pieces on this boat. The new planks and frames are coming along nicely! Flats BoatWe got the poling platform installed on the Flats boat this week. It looks so great! Chris Craft Kit BoatPhil has been working on cleaning, stripping, and sanding the interior and exterior of this little kit boat all week in preparation for a minor repair and complete refinish. He's doing an amazing job!
Back to Blog
Week of September 7-11, 20269/11/2026 Thanks for your patience as we update our website. Here's a showcase of some of our current projects. Chris Craft DeluxeAfter a long pause, we got back to work on the Deluxe. We finally got started fitting the replacement planks on the sides. LarsonWe got the original trailer powder coated back to its original color and it looks great! We made some small repairs on the keel and laid in fillet in preparation for fiberglass. Concordia SloopThe guys poured brand new lead ballast and Shane cleaned it up. It's ready to be installed! SportsmanCaity has been working hard on building up coats of varnish and making the deck lines look amazing. FlatsShane installed the deck hatches and hardware and painted the remaining areas of non-skid deck coating. Next, we will be installing the poling platforms and new rub rails.
|
RSS Feed