An update from Gary in Maine! Boat school class is going well. It looks like everyone is having a good time. We miss you Gary! Carolina Skiff Shane finished building up the aft sections for the battery boxes. He sealed all the raw wood edges and primed the bilge. 1955 Continental
Shane and Jack installed the windshield on the 55! They ran the throttle and choke cable, fixed some engine wiring and then tested the motor.
0 Comments
Carolina Skiff Shane is building up the rear sections where the batteries and control panel will end up being. Next, he'll prime the raw wood. Ski Boat I'm working on building up coats of varnish on this deck. We're almost ready for the major sand! 1967 Lyman
Jack and Shane took the Lyman to the lake to sea trial it. It went really well! The motor worked great, they just need to have another look at the oil pressure gauge. Budsin Lightning Bugs Gary delivered the final restored Budsin boat to the Point resort in upstate New York when he was heading up on his way to Maine for the summer! We had so much fun working on them, they look great back in the water! The Nancy Shane and Jack have been rewiring The Nancy and charging all batteries. 1948 Deluxe Runabout Jack removed the engine and hardware, then removed some side planks to inspect for rot. As you can see the hull is in pretty bad shape! Carolina Skiff For the Skiff, Shane pressure washed the interior. Next he'll sand and remove all the old bilge paint and prep it to be repainted. I've been sanding old varnish off and prepping for fresh varnish. Ski Boat
I filled all the old rub rail screw holes. Now I'm working on building up varnish coats on the deck. 1948 Chris Craft 17ft Deluxe Runabout New project alert! We're going to be taking a look at this one to identify how we can proceed on the restoration. The Nancy Shane is reinstalling the interior and wiring to the Nancy! 1961 Willy's Jeep Jack hand-stitched some pretty awesome new gear-shifter gaiter boots and custom made a new aluminum floor plate. He tacked all interior panels in place for dry-fitting and can now remove to begin staining. Ski Boat
After sealing the stain I was able to start the bleaching process of the king plank. After drying overnight, I neutralized it with water. Next, I can start the next steps of the bleaching stain. Bottoms Up We took Bottoms Up out to the lake for a successful sea trial! Ski Boat This week on the Ski Boat, I stained the deck and installed the bed log. I was able to get the first coat of sealer on the deck. All in all, a productive week! 1967 Lyman You're looking at 50 years of bad wiring! We're going to have to fix this. Chris Craft Holiday Shane has been putting some finishing touches on the Holiday, installing seats, interior, engine cover, and testing the engine. This one is ready for its sea trial at the lake! Carolina Skiff We received and mounted the outboard engine for the skiff. Budsin Lightning Bug The final Point Lightning Bug was ready for a sea trial, we took it to the lake and it all went well! |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
May 2024
Categories |