Cruisers Inc Shane has put the first coat of primer on the sides. Once the outer keel is installed he'll be able to paint the bottom. Lil Trax Lyman Our sign guy Mike Gregson, came by to put the lettering on the Lyman, its getting closer to being ready. now some electrical touch ups. Chris Craft Holiday We've been sanding the sides prepping it for a finish. Jack is sanding the floaty pieces (sponsons), prepping to paint them. 1967 Lyman We got both cheek blocks installed, now we can fit the new frames in place. We installed a total of 12 new, freshly varnished frames in front of the bulkhead. Aft of the bulkhead we're going to use scarf joints at the bottom. We removed the rotted section of the stem and replaced it with laminate pieces and longer additional pieces to support the structure. We added additional bolts in the new areas. 17' Sportsman
Another successful degreasing! We're going to remove the rest of the hardware and flip this boat so it's all ready for Gary's class!
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
May 2024
Categories |