Cruisers Inc. Today we all went along to Lake Townsend for the sea trial after a major restoration and a brand new motor. Carolina Skiff Nicolas is working on scarfing the joint of the bulkhead. Navis This 1947 Chris Craft was brought in for a de-winterization. An oil change and an engine check should do the trick. Budsin Lightning Bugs Nicolas has finished cutting the new mahogany strips and dry fitting in place. Once we get in the special secret black epoxy, he'll finalize the aft decking. We've flipped boat #1 so Shane can get started on the bottom; patching the keel, sanding and painting the bottom. 1967 Lyman I'm working on modifying the engine box due to the size of the new engine. U-18 Jack has finished removing the bottom and next will identify rotten frames and other problem areas that need repair. Snapdragon/White Hall
Nicolas power washed the interior and prepped it for Shane to paint.
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
May 2024
Categories |