Whitehall We flipped the Whitehall and Gary's been sanding the bottom. We'll need to repair some old patches fiberglass. Don't tell anyone we are working on fiberglass boats. Chris Craft Holiday Nicolas replaced old screws on the rear deck and placed bungs to fill. He's prepping the transom and king plank to be bleached and stained blonde. 1967 Lyman I've got all the starboard planks cut and ready to install. Now I'm working on cutting and hand-planing the portside planks. I'll wait to install both sides until everything has been cut and dry fit. 1955 Continental Jack wired up and installed the alligator dash panel, and has been reinstalling the chrome on the sides. 26' Sea Skiff
We have a few finishing touches to put on the Sea Skiff before we can take it out to the lake for a sea trial!
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
May 2024
Categories |