1957 26 ft Chris Craft Sea Skiff More testing and adjusting, almost there. Carolina Skiff Shane is cutting all the mahogany strips for the deck layout and dry fitting them in place. Setting the wider covering boards with 5200 is a two-man job, so Gary helps make sure its perfect. They clamped all those pieces down and will let it cure over the long weekend before he can get started setting the strips. Ski Boat I've got the Ski Boat deck all caught up on varnish coats and will prep the hull and deck for the final coat in the finish room. I polished all the bronze. I took apart the steering column and cleaned up some pieces in the parts washer and I'm sanding the old paint off the wheel and will prep it for some fresh coats next week. 1961 Willy's Jeep
Jack has mostly installed all the ceiling wood but we're waiting on some special fasteners to arrive. He finished installing the stick shift boot permanently.
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
May 2024
Categories |