CC Riviera The Varnish has been completed on the Riviera. Next the crew will install the white caulk lines on the deck. Soon the engine and chrome deck hardware will be ready to be installed. U18 More and more varnish done on the U18. The ceilling boards are being varnished now. Lookin good! 58 Continental The side planks and bottom have been installed! Jack is letting it cure before puttying the bottom and bunging the sides. Celebrity Deck has been completed with all an new sub deck. The coamings are being varnished along with the mahogany trim to soon be installed. Whirlwind The varnishing and painting on this boat have been completed! Carolina Flats Skiff Gary has installed the skegs and applied a sealer coat & varnish on the mahogany transom. The first coat of paint on the bottom is on and will get one to two more. Hackercraft Jack is installing an engine flush value on the hackercraft. 57 Continental Shane has stripped the varnish off the deck and started stripping the sides. He is now preparing to remove the engine to toll the boat so he can repair the bottom. Lyman Islander
The crew has removed the deck and rub rails to find rot and determine what needs to be replaced.
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
April 2025
Categories |