Be sure to stay updated on all things Lowell Boats here on our Blog, posted weekly, and our Facebooks at https://www.facebook.com/lowellboatsinc U18 This boat has done a 360 on where it came from to now. Shane is currently repairing the aft deck and will soon install the last piece of transom. Check out its before and after! CC Riviera The varnish is building up on this boat thanks to our crew! Quiz: How many coats of varnish does it take to build up to Lowell boats standard ? come back next week for the answer. 58 Continental The interior planking on the 58 has been installed. Now we wait for the adhesive to cure. Celebrity This celebrity is having its deck replaced, check it out & stay updated ! 1934 Electricraft This electricraft is having its final wiring hookup done. We love seeing a well restored boat close to finish. 19' Lyman We took this lyman out for a stroll, or as we like to call it a sea trial. Check out a clip of it on our Facebookhttps://www.facebook.com/lowellboatsinc Carolina Skiff Outboard We have got the parts in for our Carolin aSkiff to have new rub rails. Stay tuned to see the installation. Whirlwind We've got the bottom stripped and sanded on the Whirlwind and are now working on reinforcing the transom knees. Carolina FLATS skiff Our crew is removing the old decking on the Flats boat and planning out a new deck design. How cool! 1992 24ft Hackercraft
We have removed the engine for service and we are going to clean, paint and detail the engine compartment.
0 Comments
Leave a Reply. |
Welcome!Check back weekly for updates about our current projects and shop happenings! Archives
May 2024
Categories |